Skip to content
AI-generated answers are sourced from this archive. Verify against the linked source documents.

Alternatives to Accelerate Pit Water Infilling, EIS Additional Information Request 16 (BHP Billiton, December 1995)

This document provides BHP's response to a panel request for alternatives to accelerate water infilling of mined-out open pits at the Ekati Diamond Mine, discussing options such as waste rock backfilling, tailings deposition, and surface water diversion, along with their environmental and economic trade-offs for each pit.

Date
1995
Document type
Regulatory Filing
Parties
BHP, Panel
Locations
Ekati Diamond Mine, Panda pit, Koala pit, Fox pit, Leslie pit, Misery pit, Kodiak Lake, Vulture Lake, Moose Lake, Nero Lake, Nora Lake, Tri-Hump Lake, Lac de Gras, Northwest Territories
Parameters
pit infilling, water diversion, backfilling, waste rock deposition, tailings deposition, surface water, freshet flow, fisheries habitat, aquatic resources, mine development sequence, ore production, diamond output
Pages
7

Original document

Loading the document…