Annual Water Licence Geotechnical Inspection (2003), Ekati Diamond Mine (EBA Engineering, July 2003)

EBA Engineering Consultants Ltd. completed the annual water licence geotechnical inspection of seven water control structures at Ekati Diamond Mine between July 6-9, 2003, including Phase I Pond, Panda Diversion Dam, Long Lake Outlet Dam, Intermediate Dyke B, King Pond Dam, Waste Rock Dam, and Desperation Pond Cofferdams, documenting their condition through visual observations, ground temperature data, and settlement monitoring.

Date
Document type
Report
Parties
BHP Billiton Diamonds Inc., EBA Engineering Consultants Ltd.
Locations
Ekati Diamond Mine, Northwest Territories, Phase I Pond, Panda Diversion Dam, Long Lake Outlet Dam, Intermediate Dyke B, King Pond Dam, Waste Rock Dam, Desperation Pond, North Panda Lake, Long Lake Containment Facility, Leslie Lake, Cujo Lake, Lac de Gras, Misery Pit, Cell B, Cell C, Cell D, Cell E
Parameters
geotechnical inspection, water control structures, ground temperature, settlement monitoring, water levels, seepage, stability, permafrost, active layer, thermosyphons, processed kimberlite, thaw settlement, HDPE liner, frozen core
Pages
164

Original document

Loading the document…