Annual Water Licence Geotechnical Inspection (EBA Engineering, August 2002)

EBA Engineering completed the annual water licence geotechnical inspection of five water-retaining structures at Ekati Diamond Mine between July 19–23, 2002, documenting observations on stability, water levels, ground temperatures, seepage, and settlement at Phase 1 Pond, Panda Diversion Dam, Long Lake Outlet Dam, Intermediate Dyke B, and King Pond Dam.

Date
2002
Document type
Report
Parties
EBA Engineering Consultants Ltd., BHP Billiton Diamonds Inc., A.T. Eglauer, D.C. Cathro
Locations
Ekati Diamond Mine, Northwest Territories, Phase 1 Pond, Panda Diversion Dam, Long Lake Outlet Dam, Intermediate Dyke B, King Pond Dam, North Panda Lake, South Panda Lake, Leslie Lake, Long Lake, Cell B, Cell C, Cell E, Misery Pit, King Pond, Desperation Pond, Fox Lake
Parameters
water levels, ground temperatures, seepage, stability, settlement, liner integrity, permafrost, active layer depth, dam crest, processed kimberlite containment, thermosyphon performance