Aquatic Effects Monitoring Program (AEMP) 2020–2022 Design Plan, Version 7.0, Appendix B, Ekati Diamond Mine (Dominion Diamond, December 2019)
This document presents the proposed 2020 to 2022 Aquatic Effects Monitoring Program (AEMP) Design Plan Version 7.0 for the Ekati Diamond Mine, which consolidates monitoring across four geographic areas and incorporates the Aquatic Response Framework. The plan outlines comprehensive monitoring protocols for physical, chemical, and biological parameters in lakes and streams to detect mine-related effects on the aquatic environment.
- Date
- 2019-12-15
- Document type
- report
- Parties
- Dominion Diamond Mines ULC, ERM Consultants Canada Ltd., Wek'èezhìi Land and Water Board
- Locations
- Ekati Diamond Mine, Northwest Territories, Lac de Gras, Koala Watershed, King-Cujo Watershed, Lac du Sauvage, Pigeon-Fay and Upper Exeter Watershed, Horseshoe Watershed, Lower Exeter Lake, Yellowknife, Coppermine River, Arctic Circle
- Parameters
- water quality, sediment quality, hydrology, physical limnology, phytoplankton, zooplankton, benthos, fish, dissolved oxygen, temperature, ammonia, phosphorus, metals, chlorophyll a, aquatic effects
- Pages
- 109
Original document
Loading the document…