Skip to content
AI-generated answers are sourced from this archive. Verify against the linked source documents.

Aquatic Effects Monitoring Program (AEMP) 2020–2022 Design Plan, Version 7.0, Appendix B, Ekati Diamond Mine (Dominion Diamond, December 2019)

This document presents the proposed 2020 to 2022 Aquatic Effects Monitoring Program (AEMP) Design Plan Version 7.0 for the Ekati Diamond Mine, which consolidates monitoring across four geographic areas and incorporates the Aquatic Response Framework. The plan outlines comprehensive monitoring protocols for physical, chemical, and biological parameters in lakes and streams to detect mine-related effects on the aquatic environment.

Date
Document type
Report
Parties
Dominion Diamond Mines ULC, ERM Consultants Canada Ltd., Wek'èezhìi Land and Water Board
Locations
Ekati Diamond Mine, Northwest Territories, Lac de Gras, Koala Watershed, King-Cujo Watershed, Lac du Sauvage, Pigeon-Fay and Upper Exeter Watershed, Horseshoe Watershed, Lower Exeter Lake, Yellowknife, Coppermine River, Arctic Circle
Parameters
water quality, sediment quality, hydrology, physical limnology, phytoplankton, zooplankton, benthos, fish, dissolved oxygen, temperature, ammonia, phosphorus, metals, chlorophyll a, aquatic effects
Pages
109

Original document

Loading the document…