Aquatic Effects Monitoring Program (AEMP) 2022 Re-evaluation Report and Point Lake AEMP Design, Reasons for Decision, Ekati Diamond Mine (Wek'èezhìı Land and Water Board, May 2023)
The Wek'èezhìı Land and Water Board approved the 2022 AEMP Re-evaluation Report and AEMP Design Plan Version 8.0 with required revisions, and approved the Point Lake AEMP Design Plan Version 1.0 for integration into the site-wide plan. The Board rejected Arctic's recommendations to remove zinc from water and sediment quality monitoring, required expanded non-lethal Slimy Sculpin sampling, and directed clarifications on uranium benchmarks and Response Framework procedures.
- Date
- 2023-05-23
- Document type
- regulatory-filing
- Parties
- Wek'èezhìı Land and Water Board, Arctic Canadian Diamond Company Ltd., Independent Environmental Monitoring Agency, Government of the Northwest Territories - Environment and Climate Change, Fisheries and Oceans Canada, Environment and Climate Change Canada
- Locations
- Ekati Diamond Mine, Lac de Gras, Northwest Territories, Wekweètì, Yellowknife, Calgary, Koala Watershed, King-Cujo Watershed, Pigeon-Fay Watershed, Upper Exeter Watershed, Carrie Pond Watershed, Horseshoe Watershed, Lower Exeter Lake, Point Lake, Cujo Lake, Logan Outflow, HWL4 Outflow, Two Rock Settling Pond, Horseshoe Lake
- Parameters
- Aquatic Effects Monitoring Program, water quality, sediment quality, zinc, uranium, phytoplankton, zooplankton, benthos, fish, Slimy Sculpin, Lake Trout, catch per unit effort, chlorophyll a, total iron, total vanadium, selenium, chloride, physical limnology, Response Framework, Action Levels, mine-related effects
- Pages
- 22