Skip to content
AI-generated answers are sourced from this archive. Verify against the linked source documents.

Aquatic Effects Monitoring Program (AEMP) Re-Evaluation & Refinement, Draft Scope of Work, Ekati Diamond Mine (BHP Billiton, July 2002)

This draft scope of work outlines the re-evaluation and refinement of the Aquatic Effects Monitoring Program (AEMP) and Panda Diversion Channel Monitoring Program (PDCMP) at Ekati Diamond Mine, detailing specific issues to be evaluated (sampling locations, frequencies, parameters, QA/QC procedures) and proposed analytical methodologies to improve monitoring programs for 2003-2007 field seasons.

Date
Document type
Report
Parties
BHP Billiton, BHP Billiton Diamonds Inc., Environment Canada, Department of Fisheries and Oceans, Department of Indian and Northern Affairs, Mackenzie Valley Land and Water Board, Independent Environmental Monitoring Agency, Kitikmeot Inuit Association, Department of Wildlife and Renewable Resources, Rescan Environmental Services, Dillon Consulting Limited
Locations
Ekati, Yellowknife, Vulture Lake, Grizzly Lake, Leslie Lake, Little Lake, Kodiak Lake, Moose Lake, Nema Lake, Slipper Lake, Lac de Gras, Cujo Lake, Lac du Sauvage, Nanuq Lake, Counts Lake, Beartooth Pit, Long Lake Containment Facility, Koala Watershed, Pigeon Diversion Structure, Diavik
Parameters
water quality, fugitive dust, phytoplankton, zooplankton, chlorophyll a, sediment quality, hydrology, major ions, mercury, nutrient input, indicator species, biomass, abundance
Pages
208

Original document

Loading the document…