Skip to content
AI-generated answers are sourced from this archive. Verify against the linked source documents.

Baseline Information on Permafrost, EIS Additional Information Section 8 (BHP Billiton, 1995)

This document responds to a regulatory panel request for baseline information on permafrost conditions at the BHP Diamonds (Ekati) project. It describes existing permafrost data collected since 1993 through boreholes, thermistor cables, and ground-penetrating radar surveys, confirms permafrost thickness of 230–280 m, identifies future geotechnical investigation needs for secondary structures, and documents minor thermally induced ground instability encountered during exploration and construction.

Date
1995
Document type
Regulatory Filing
Parties
BHP Diamonds Inc., BHP Minerals Canada Ltd., EBA Engineering Consultants Ltd., Bruce Geotechnical Consultants Ltd., Hemmera Resource Consultants Ltd., Rescan Environmental Services Ltd., Geological Survey of Canada
Locations
Ekati Diamond Mine, Lac de Gras, Northwest Territories, Fox bulk sample decline, Koala plant site, Long Lake dam, Panda Lake diversion dam, Paul Lake, Airport esker
Parameters
permafrost, ground ice, active layer thickness, ground temperature, geothermal gradient, tailings dams, foundations, thermally induced ground instability, permafrost thaw, soil settlement
Pages
5

Original document

Loading the document…