Bearclaw Diversion Dam 2002 Geotechnical Site Investigation (EBA Engineering, July 2002)
Geotechnical site investigation report for the proposed Bearclaw Diversion Dam at the Ekati Diamond Mine, documenting subsurface conditions from eight boreholes drilled in April 2002 to support the development of the Beartooth kimberlite pipe. The investigation characterized till overburden (0.3–5.8 m thick) overlying granite bedrock, ground temperature regimes indicating warm permafrost, and bedrock joint characteristics for dam design.
- Date
- 2002-07-01
- Document type
- report
- Parties
- BHP Billiton Diamonds Inc., EBA Engineering Consultants Ltd., Connors Drilling Ltd.
- Locations
- Ekati Diamond Mine, Bearclaw Lake, Beartooth Lake, North Panda Lake, Beartooth Stream, Yellowknife, Northwest Territories, Edmonton, Alberta
- Parameters
- geotechnical investigation, permafrost, ground temperature, bedrock quality, till composition, water diversion, subsurface conditions, borehole drilling, rock quality designation, fracture frequency, ground ice, overburden, granite bedrock
- Pages
- 58
Original document
Loading the document…