Skip to content
AI-generated answers are sourced from this archive. Verify against the linked source documents.

Bearclaw Diversion Dam 2002 Geotechnical Site Investigation (EBA Engineering, July 2002)

Geotechnical site investigation report for the proposed Bearclaw Diversion Dam at the Ekati Diamond Mine, documenting subsurface conditions from eight boreholes drilled in April 2002 to support the development of the Beartooth kimberlite pipe. The investigation characterized till overburden (0.3–5.8 m thick) overlying granite bedrock, ground temperature regimes indicating warm permafrost, and bedrock joint characteristics for dam design.

Date
Document type
Report
Parties
BHP Billiton Diamonds Inc., EBA Engineering Consultants Ltd., Connors Drilling Ltd.
Locations
Ekati Diamond Mine, Bearclaw Lake, Beartooth Lake, North Panda Lake, Beartooth Stream, Yellowknife, Northwest Territories, Edmonton, Alberta
Parameters
geotechnical investigation, permafrost, ground temperature, bedrock quality, till composition, water diversion, subsurface conditions, borehole drilling, rock quality designation, fracture frequency, ground ice, overburden, granite bedrock
Pages
58

Original document

Loading the document…