Skip to content
AI-generated answers are sourced from this archive. Verify against the linked source documents.

Beartooth Pipe Waste Rock and Ore Storage Management Plan, Ekati Diamond Mine (BHP Billiton, April 2003)

This waste rock and ore storage management plan for the Beartooth Pipe at Ekati Diamond Mine addresses regulatory requirements for managing drainage from ore and waste rock storage areas. The plan includes geochemical characterization results, predicted water quality, and monitoring strategies for the proposed mining operation.

Date
2003
Document type
Report
Parties
BHP Billiton Diamonds Inc., Mackenzie Valley Land and Water Board, EBA Engineering, SRK Consulting, Canadian Environmental and Metallurgical Inc., Bryant Environmental
Locations
Ekati Diamond Mine, Beartooth Pipe, Beartooth Lake, North Panda Lake, Panda Pipe, Koala Pipe, Fox Pipe, Misery Pipe, Sable Pipe, Pigeon Pipe, Long Lake Containment Facility, Kodiak Lake, Bearclaw Lake, Northwest Territories, Slave Structural Province
Parameters
waste rock storage, ore storage, drainage management, water quality, geochemical characterization, acid-base accounting, sulphur concentrations, neutralization potential, temperature monitoring, seepage monitoring, permafrost, acid generating potential, nickel leaching, carbonate minerals, kimberlite reactivity, biotite granite, diabase, biotite schist
Pages
126

Original document

Loading the document…