Skip to content
AI-generated answers are sourced from this archive. Verify against the linked source documents.

BHP Diamonds Newsletter, Issue 6: EKATI Diamonds Go Retail (BHP Billiton, April 2001)

BHP Diamonds Inc. newsletter for April 2001 covering EKATI™ Diamond Mine operations, including the launch of the EKATI™ brand retail diamonds, safety achievements, environmental workshop results, regulatory approvals for new kimberlite pipes (Sable, Pigeon, Beartooth), winter road resupply operations, and various community and corporate initiatives.

Date
Document type
Report
Parties
BHP Diamonds Inc., Arslanian Cutting Works (NWT) Limited, American Gemological Society Laboratory, Government of the Northwest Territories, Wasserman & Partners Advertising, James Hoggan + Associates, MVI, JDJ Consulting, Echo Bay Mines Ltd., Diavik Diamond Mines Inc., De Beers, Mackenzie Valley Environmental Impact Review Board (MVEIRB), Department of Indian Affairs and Northern Development (DIAND), Northern Alberta Institute of Technology (NAIT), Yellowknife Fire Department, RTL Robinson Enterprises, Tli Cho Landtran Transport, Prince of Wales Northern Heritage Centre, Canadian Museum of Nature, Dia Met Minerals Ltd., Australian High Commission
Locations
Ekati Diamond Mine, Northwest Territories, Yellowknife, Montreal, Toronto, Ottawa, Calgary, Edmonton, Vancouver, Point Lake, Lupin Gold Mine, Long Lake Containment Facility, Panda Waste Rock storage area, Misery Pit, Kugluktuk, Melbourne, Ottawa, Antwerp
Parameters
diamond quality and certification, diamond cutting standards, occupational health and safety, loss time accidents, environmental monitoring, aquatic surveys, wildlife surveys, caribou, fish survival rates, winter road operations, kimberlite pipe mining, air quality, fuel consumption, power plant efficiency, emergency response preparedness, fire protection
Pages
8

Original document

Loading the document…