BHP Newsletter, Issue 6 (BHP Billiton, December 2000)
BHP Diamonds Inc. newsletter for December 2000 reporting on Ekati Diamond Mine operations, including Family Day visits, environmental assessment progress for Sable, Pigeon and Beartooth pipes, reclamation research at Long Lake Containment Facility, mining development at Koala and Misery pits, and operational improvements in safety, maintenance, and workforce development.
- Date
- 2000-12-01
- Document type
- report
- Parties
- BHP Diamonds Inc., Ekati Diamond Mine, Mackenzie Valley Environmental Impact Review Board (MVEIRB), Department of Indian Affairs and Northern Development (DIAND), Mackenzie Valley Land and Water Board, Department of Fisheries and Oceans, Tire Tech, Finning, Transwest, Kingland Ford, Nuna Logistics, NWT Rock, Sub-Arctic Surveys, Kitikmeot Catering, Medic North
- Locations
- Ekati Diamond Mine, Northwest Territories, Yellowknife, Hay River, Wha Ti, Rae Lakes, Wekweti, Kugluktuk, Fort Smith, Lutsel 'ke, Edmonton, Long Lake Containment Facility (LLCF), Koala Lake, Panda pit, Koala pit, Koala North, Misery pit, Lac de Gras, Lac du Sauvage, Diavik mine, King Pond, Misery Lake, N'Dilo, Sable Lake, Pigeon pipe, Beartooth pipe, Inuvik, Fort Smith, Antwerp
- Parameters
- water quality, environmental assessment, processed kimberlite tailings, vegetation reclamation, wetland ecosystem, mining operations, waste rock management, ore processing, acidic runoff, waste dump construction, dewatering, water treatment, equipment maintenance, tire management, operator reliability, safety culture, closure planning
- Pages
- 8
Original document
Loading the document…