Contaminated Snow Containment Facility 2004 Annual Report (EBA Engineering, March 2005)
This 2004 annual report documents the operational activities and management of the Contaminated Snow Containment Facility (CSCF) at Ekati Diamond Mine, including ice transfer, facility inspections, water sampling results, and removal of hydrocarbon-impacted water and debris. The facility successfully contained approximately 422 m³ of hydrocarbon-impacted ice and managed 234.5 m³ of contaminated water disposal during the 2004 operational season.
- Date
- 2005-03-01
- Document type
- report
- Parties
- BHP Billiton Diamonds Inc., EBA Engineering Consultants Ltd., Nuna Contracting Limited, Department of Indian and Northern Affairs Canada (INAC), Independent Monitoring Agency, ALS Environmental
- Locations
- Ekati Diamond Mine, Northwest Territories, Yellowknife, Landfarm, Racetrack, Panda/Koala Waste Rock Storage Area, Ekati Landfill, Zone S, Waste Management Building
- Parameters
- hydrocarbon-impacted snow, water quality, hydrocarbons, oil and grease, BTEX (benzene, toluene, ethylbenzene, xylenes), glycols, volatile hydrocarbons, CCME hydrocarbon fractions F1 and F2, waterfowl deterrence, water sampling
- Pages
- 21