Skip to content
AI-generated answers are sourced from this archive. Verify against the linked source documents.

Contaminated Snow Containment Facility 2004 Annual Report (EBA Engineering, March 2005)

This 2004 annual report documents the operational activities and management of the Contaminated Snow Containment Facility (CSCF) at Ekati Diamond Mine, including ice transfer, facility inspections, water sampling results, and removal of hydrocarbon-impacted water and debris. The facility successfully contained approximately 422 m³ of hydrocarbon-impacted ice and managed 234.5 m³ of contaminated water disposal during the 2004 operational season.

Date
Document type
Report
Parties
BHP Billiton Diamonds Inc., EBA Engineering Consultants Ltd., Nuna Contracting Limited, Department of Indian and Northern Affairs Canada (INAC), Independent Monitoring Agency, ALS Environmental
Locations
Ekati Diamond Mine, Northwest Territories, Yellowknife, Landfarm, Racetrack, Panda/Koala Waste Rock Storage Area, Ekati Landfill, Zone S, Waste Management Building
Parameters
hydrocarbon-impacted snow, water quality, hydrocarbons, oil and grease, BTEX (benzene, toluene, ethylbenzene, xylenes), glycols, volatile hydrocarbons, CCME hydrocarbon fractions F1 and F2, waterfowl deterrence, water sampling
Pages
21

Original document

Loading the document…