Desperation Pond West Cofferdam As-Built Construction Report, Ekati Diamond Mine (EBA Engineering, October 2002)

Desperation Pond West Cofferdam As-Built Construction Report for the Ekati Diamond Mine (BHP Billiton Diamonds Inc., Project No. 0101-94-11580.058), October 2002, prepared by EBA Engineering Consultants Ltd. Documents construction of the West Cofferdam with 184,450 m³ water storage at 1 m freeboard, key-trench excavation with Cat 345 excavator at Sta. 0+070, levelling-course compaction with Cat CS-563C vibratory compactor, fillet-zone placement with Cat D4H bulldozer (Sta. 0+040 to 0+060), and EBA Aggregate Analysis Report (200 mm sieve summary, March 5 2002 sample).

Date
2002
Document type
Report
Parties
BHP Billiton Diamonds Inc., EBA Engineering Consultants Ltd., Melody McLeod, Mackenzie Valley Land and Water Board, MVLWB
Locations
Yellowknife, Northwest Territories
Parameters
cofferdam, as-built construction report, water storage, desperation pond, water licence N2L7-1616, ekati diamond mine
Pages
49