Skip to content
AI-generated answers are sourced from this archive. Verify against the linked source documents.

East Desperation Pond Cofferdam As-Built Construction Report, Ekati Diamond Mine (EBA Engineering, July 2002)

East Desperation Pond Cofferdam As-Built Construction Report for the Ekati Diamond Mine (BHP Billiton Diamonds Inc., Project No. 0101-94-11580.058), July 2002, prepared by EBA Engineering Consultants Ltd. Includes the As-Built Construction Drawings package (Drawing Index: 11580.058-DPAB01 General Location and Misery Site Plan), UTM Coordinates (NAD 83), East Cofferdam construction sequence (GCL Liner placement at elevations 5.10 / 2.95 / 2.15 / 0.75 m), and loading-ramp configuration for front-end-loader external-feed hopper with Grizzly conveyor.

Date
2002
Document type
Report
Parties
BHP Billiton Diamonds Inc., EBA Engineering Consultants Ltd., Melody Macleod, Mackenzie Valley Land and Water Board, MVLWB
Locations
Yellowknife, Northwest Territories
Parameters
cofferdam, as-built construction, desperation pond, water licence N7L2-1616, waste rock dam, ekati diamond mine
Pages
66

Original document

Loading the document…