EKATI Newsletter, Issue 6 (BHP Billiton, April 2001)
BHP Diamonds Inc.'s April 2001 newsletter covering Ekati Diamond Mine operations, including the launch of EKATI™ brand retail diamonds, safety achievements, environmental workshops, regulatory progress on new kimberlite pipes (Sable, Pigeon, Beartooth), and winter resupply logistics.
- Date
- 2001-04-01
- Document type
- report
- Parties
- BHP Diamonds Inc., Ekati Diamond Mine, Arslanian Cutting Works (NWT) Limited, American Gemological Society Laboratory, Government of the Northwest Territories, Wasserman & Partners Advertising, James Hoggan + Associates, MVI, JDJ Consulting, Echo Bay Mines Ltd., Diavik Diamond Mines Inc., De Beers, Mackenzie Valley Environmental Impact Review Board (MVEIRB), Department of Indian Affairs and Northern Development (DIAND), Northern Alberta Institute of Technology (NAIT), Yellowknife Fire Department, RTL Robinson Enterprises, Tli Cho Landtran Transport, Canadian Museum of Nature, Prince of Wales Northern Heritage Centre, Dia Met Minerals Ltd., Independent Environmental Monitoring Agency, BHP Minerals
- Locations
- Ekati Diamond Mine, Northwest Territories, Yellowknife, Point Lake, Montreal, Toronto, Ottawa, Calgary, Edmonton, Vancouver, Panda Diversion Channel, Long Lake Containment Facility, Panda Waste Rock storage area, Sable pipe, Pigeon pipe, Beartooth pipe, Misery Pit, Edmonton, Melbourne, Kugluktuk, Ottawa, Lupin Gold Mine, Canada, Antwerp, Prince of Wales Heritage Centre
- Parameters
- diamond quality and certification, worker safety, loss time accidents, health and safety standards, environmental monitoring, aquatic surveys, wildlife surveys, fish survival rates, wildlife incident reporting, haul roads, snow surveys, kimberlite mining, water quality, air quality, diesel fuel consumption, electrical energy conversion, thermal energy recovery, particulate emissions, NOx emissions, emergency response preparedness
- Pages
- 8
Original document
Loading the document…