Skip to content
AI-generated answers are sourced from this archive. Verify against the linked source documents.

Emergency Response & Contingency Plans (603g), NWT Diamonds Project (BHP Billiton, December 1995)

BHP's response to the Environmental Assessment Panel's request for additional information on emergency response and contingency plans for the NWT Diamonds Project, particularly addressing spill response procedures for the Echo Bay Winter Road and mine operations, including historical spill data, equipment inventories, personnel training requirements, and detailed response protocols for various environmental media.

Date
Document type
Regulatory Filing
Parties
BHP Diamonds Inc., BHP Minerals Canada Ltd., Echo Bay Mines Ltd., A.R.S. Trucking and Welding Ltd., Shell Canada, Environment Canada, GNWT Department of Renewable Resources, NWT Diamonds Project, Robinson's Trucking, Merlin Transport, Two Way Enterprises, RTL Robinsons Enterprises, Rescan, BXL Bulk Explosives Limited, Sandwell Inc., Transport Canada
Locations
Ekati Diamond Mine, NWT (Northwest Territories), Echo Bay Winter Road, Lac de Gras, Lupin Mine Site, Yellowknife, Hay River, Ross Lake, Hardy Lake, Drybones Camp, Lee Lake, Drybones Lake, Campbell Lake, Mckay Lake, Portage Bay, Dome Lake, Mackay Lake, Warburton Bay, Old Drybones Camp, Burnt Island, Gordon Lake, Indin Lake, Lockhart Lake, Tibbet Lake, Long Lake, Alberta-NWT border
Parameters
spill response, emergency response, contingency plans, fuel transportation, diesel fuel, hazardous materials, winter road safety, tanker recovery, water quality, environmental impacts, tailings pipeline, tailings impoundment, sewage treatment, explosives handling, petroleum products, dangerous goods transport, spill prevention, spill containment, environmental management system
Pages
27

Original document

Loading the document…