Interim Closure and Reclamation Plan (ICRP) Annual Progress Report, Appendix H, Ekati Diamond Mine (Arctic Canadian Diamond Company, January 2024)
Burgundy Diamond Mines' 2022-2023 Annual Closure and Reclamation Progress Report documents reclamation research, activities, and closure planning at the Ekati Diamond Mine, including Long Lake Containment Facility stabilization, vegetation monitoring, Old Camp reclamation, Pigeon Pit closure design, and updated reclamation security holdings of $313.3 million as of January 31, 2024.
- Date
- 2024-01-31
- Document type
- report
- Parties
- Burgundy Diamond Mines Ltd., Wek'èezhìi Land and Water Board, Mason Mantla, Kurtis Trefry, Feyi Adebayo, Government of the Northwest Territories, Mackenzie Valley Land and Water Board, Aboriginal Affairs and Northern Development Canada
- Locations
- Ekati Diamond Mine, Northwest Territories, Yellowknife, Long Lake Containment Facility, Pigeon Pit, Fox Pit, Panda Pit, Koala Pit, Koala North Pit, Beartooth Pit, Lynx Pit, Sable Pit, Misery Pit, Point Lake, Old Camp, Upper Exeter Lake, Lac de Gras, Lac du Sauvage
- Parameters
- closure and reclamation, water quality, vegetation monitoring, ground temperature conditions, waste rock storage areas, erosion, seepage, pit flooding, littoral zones, thermal analysis, infiltration, arsenic, aluminum, reclamation security, progressive reclamation, caribou migration, geotechnical stability
- Pages
- 578
Original document
Loading the document…