Land Use Permit W2021D0005 Inspection Report, Point Lake, Ekati Diamond Mine (Government of the Northwest Territories, Environment and Climate Change, February 2025)
Environmental inspection report of the Point Lake Mining Project at Ekati Diamond Mine conducted on February 12, 2025, documenting compliance with Land Use Permit W2021D0005 operating conditions. Minor concerns regarding secondary containment for equipment and refueling points were noted and promptly rectified by the permittee.
- Date
- 2025-02-19
- Document type
- report
- Parties
- Arctic Canadian Diamond Company Ltd., Government of Northwest Territories, Environment and Climate Change (GNWT), Wek'èezhìi Land and Water Board, Independent Environmental Monitoring Agency, Joseph Heron, Tom Bradbury, Gavin MacDougall, Richard Ehlert, Jonah Kelly, Jamie Steele, Rhiana Bams, Marc Casas, Jamie Mistry
- Locations
- Point Lake Project, Ekati Diamond Mine, Northwest Territories, Point Lake Pit, Yellowknife
- Parameters
- mining operations, bulk sample collection, overburden and waste rock stockpiling, secondary containment, fuel storage and handling, spill prevention and response, water ponding and erosion control, waste rock seepage management, equipment refueling, land restoration
- Pages
- 8
Original document
Loading the document…