Skip to content
AI-generated answers are sourced from this archive. Verify against the linked source documents.

Landfarm 2004 Annual Report, Ekati Diamond Mine (EBA Engineering, March 2005)

Ekati Diamond Mine Landfarm 2004 Annual Report, prepared by EBA Engineering Consultants Ltd. for BHP Billiton Diamonds Inc. (Yellowknife), March 2005, EBA Project 5100945.001. Documents the Landfarm sump (east corner) and hydrocarbon-impacted soil stockpiles photographed June-August 2004 from multiple angles, and Enviro-Test Soil Salinity Conversion analytical results (Lab L156547, Sample TP7 sampled March 1 2004) for Chloride, Sulphate, Calcium, Potassium, Magnesium, Sodium in mg/L, %Sat, Meq/L, Dry Soil mg/kg formats.

Date
2005
Document type
Report
Parties
BHP Billiton Diamonds Inc., EBA Engineering Consultants Ltd.
Locations
Yellowknife, Northwest Territories
Parameters
landfarm, hydrocarbon impacted soil, soil remediation, contaminated soil, sump, annual report, ekati diamond mine
Pages
64

Original document

Loading the document…