Long Lake Containment Facility (LLCF) Review and Optimization Meeting #3, Ekati Diamond Mine (BHP Billiton, February 2005)

Minutes from the Ekati Long Lake Containment Facility (LLCF) Review and Optimization Meeting #3 (February 7-8, 2005), documenting a Multiple Accounts Analysis (MAA) evaluation process and detailed lessons learned from five years of LLCF operation, including operational, hydrological, reclamation, and wildlife habitat findings. The meeting reviewed five management options for processed kimberlite disposal and closure strategies.

Date
Document type
Meeting Minutes
Parties
BHP Billiton, Robertson GeoConsultants Inc., EBA Engineering Consultants Ltd., Sub Arctic Surveys Ltd.
Locations
Ekati Diamond Mine, Long Lake Containment Facility (LLCF), Cell A, Cell B, Cell C, Cell D, Cell E, Fox Lake, Panda Lake, Exeter watershed, Northwest Territories
Parameters
processed kimberlite (PK) management, water quality, beach angles, ice entrainment, storage capacity, dyke performance, erosion, vegetation establishment, closure and reclamation, cover systems, permafrost, metal uptake, caribou habitat, dust dispersion, surface drainage, tailings discharge