Matthews Lake and Area Fish Habitat Restoration Program, 2003 to 2004 Project Documents (BHP Billiton, April 2004)
Matthews Lake and Area Fish Habitat Restoration Program — 2003 Site Baseline Assessment, April 2004, prepared by Dillon Consulting Limited for the Department of Fisheries and Oceans (DFO Fish Habitat Management, Yellowknife) and submitted to Carole Mills (Independent Environmental Monitoring Agency), File 03-1851-2000. Documents the November 2003 Pre-Construction Workshop with regulatory agencies and stakeholders, references aquatic habitat assessment methodology (Bain & Stevenson 1999), stream dimensions at road crossings (7 m wide / 10 m long / 0.1 m avg depth, 0.03 m/s velocity, 10% fine / 50% gravel / 30% cobble / 10% boulder substrate), and excavation plans for connecting Sandy Lake to Ponds A, B, C and Matthews Lake.
- Date
- 2003–2004
- Document type
- report
- Parties
- Department of Fisheries and Oceans, DFO, Dillon Consulting Limited, Carole Mills, Independent Environmental Monitoring Agency, Fish Habitat Compensation Fund Advisory Committee
- Locations
- Yellowknife, Northwest Territories, Matthews Lake
- Parameters
- fish habitat, restoration, matthews lake, baseline assessment, fish habitat compensation, DFO
- Pages
- 138
Original document
Loading the document…