Panda Diversion Channel Monitoring Program Technical Report, Stream Habitat Compensation Program, Ekati Diamond Mine (BHP Billiton, January 2000)
Panda Diversion Channel (PDC) Monitoring Program 1999 Technical Report (Final, January 2000, BHP Diamonds Inc., File 4.3.8.1, Project 99-6331). Includes the 1999 Aquatic Effects Monitoring Program transmittal to Gordon Wray (NWT Water Board, File N7L2-1616), Phase I and II PDC habitat-enhancement completion (BHP 1998) status, Bear Tooth Lake / Camp / Sediment Berms / Sediment Curtains / Kodiak Lake / Koala Lake Dam site plan, Panda Pit and Panda Lake configuration drawings, and PDC Revegetation report (Table 3 mean sediment properties for willow / Salix sp. cuttings and Arctic Pendant Grass / Arctophila fulva sprigs).
- Date
- 1999–2000
- Document type
- report
- Parties
- BHP Diamonds Inc., BHP, Dillon Consulting Limited, NWT Water Board, Gordon Wray
- Locations
- Yellowknife, Northwest Territories, Ekati
- Parameters
- panda diversion channel, PDC, stream habitat compensation, aquatic effects monitoring, water licence N7L2-1616, ekati diamond mine
- Pages
- 537
Original document
Loading the document…