Panda Diversion Channel Sedimentation Management & Contingency Plan (BHP Billiton, February 1998)
This is BHP Diamonds Inc.'s Sedimentation Management and Contingency Plan for the Panda Lake Diversion Channel at the Ekati Mine in the NWT, addressing sediment impacts to Kodiak Lake that occurred during the 1997 spring freshet. The plan outlines short-term stabilization and mitigation measures (including Grizzly Creek restoration, bank stabilization, and sediment curtains) and long-term monitoring and restoration strategies to minimize future sedimentation from channel construction and permafrost degradation.
- Date
- 1998-02-01
- Document type
- report
- Parties
- Dillon Consulting Limited, BHP Diamonds Inc., Department of Fisheries and Oceans (DFO), Environment Canada, DIAND, Rescan Environmental Services Limited, EBA Engineering
- Locations
- Ekati Mine, Northwest Territories, Panda Lake, Kodiak Lake, Koala Lake, Grizzly Creek, Buster Lake, Buster Creek, Grizzly Lake, West Panda Lake, Polar Lake, Beartooth Lake, Grizzly Lake Road, Koala Camp Road, Misery Lake, Airport Road
- Parameters
- sedimentation management, sediment mitigation, sediment monitoring, permafrost degradation, total suspended solids (TSS), turbidity, Secchi depth, light transmission, erosion control, bank stabilization, water quality, fish habitat compensation, channel restoration, sediment containment, aquatic vegetation restoration
- Pages
- 26