Pigeon Stream Diversion Design Summary Report, Ekati Diamond Mine (EBA Engineering, January 2007)

This detailed design report for the Pigeon Stream Diversion at the Ekati Diamond Mine describes a 430-meter engineered channel to route Pigeon Stream around the proposed open pit development, maintaining fish passage and seasonal habitat compensation with thermal stability over 3-5 years. The design includes three sections (inlet, routing, outlet pool), a geomembrane liner system, and construction specifications for winter implementation.

Date
Document type
Report
Parties
BHP Billiton Diamonds Inc., EBA Engineering Consultants Ltd., Rescan Environmental Services Ltd., Department of Fisheries and Oceans, Foundex Exploration Ltd.
Locations
Ekati Diamond Mine, Northwest Territories, Pigeon Stream, Pigeon Pond, Upper Pigeon Pond A, Fay Lake, Pigeon Kimberlite Pipe, Process Plant, Pigeon Pit, Pigeon Watershed, Yellowknife
Parameters
stream diversion design, water flow, fish habitat, thermal analysis, thaw depth, permafrost, hydraulic performance, geotechnical conditions, fresh water discharge, ground ice, substrate material, liner system