Reclamation Cost Estimate for Closure in 1999, Ekati Diamond Mine (BHP Billiton, March 1999)

This document provides a detailed reclamation cost estimate for the Ekati Diamond Mine assuming closure in 1999, broken down by reclamation unit (Panda Pit, Panda Waste Dump, Long Lake Containment Area, Buildings and Facilities, and Chemicals/Contaminated Soils), with a total estimated closure cost of $6,671,716 including 10 years of post-closure monitoring.

Date
Document type
Report
Parties
BHP Diamonds Inc., H. Goetz, Engineering and Resource Planning, Ekati Diamond Mine
Locations
Ekati Diamond Mine, Panda Pit, Panda Waste Dump, Long Lake Containment Area, Koala Lake, Paul Lake, Old Camp, New Camp, Northwest Territories, Yellowknife
Parameters
mine closure, reclamation, slope stabilization, vegetation establishment, tailings management, waste rock handling, contaminated soil remediation, ammonium nitrate removal, fuel tank cleanup, site monitoring, erosion control, drainage channels, building demolition