Responses to Information Requests for Sable, Pigeon and Beartooth Kimberlite Pipes (BHP Billiton, February 2002)
BHP Billiton's formal responses to multiple regulatory information requests concerning the proposed development of three kimberlite pipes (Sable, Pigeon, and Beartooth) at the Ekati Diamond Mine, addressing topics including road design and wildlife impacts, water quality monitoring, waste rock and hydrocarbon management, surface water diversion engineering, and aquatic effects monitoring protocols.
- Date
- 2002-02-01
- Document type
- regulatory-filing
- Parties
- BHP Billiton Diamonds Inc., Independent Environmental Monitoring Agency, Mackenzie Valley Land and Water Board, Department of Indian and Northern Affairs Canada, Environment Canada, Department of Fisheries and Oceans
- Locations
- Ekati Diamond Mine, Northwest Territories, Sable Kimberlite Pipe, Pigeon Kimberlite Pipe, Beartooth Kimberlite Pipe, Sable Lake, Two Rock Lake, Horseshoe Lake, North Panda Lake, Bearclaw Lake, Beartooth Lake, Long Lake Containment Facility, Panda Diversion Channel
- Parameters
- water quality, aquatic effects monitoring, waste rock management, road design, caribou migration, surface water impacts, drainage patterns, metals concentrations, nutrient levels, fish passage, dissolved oxygen, hydrocarbon contamination, dust suppression, stream benthos, phytoplankton, zooplankton