Skip to content
AI-generated answers are sourced from this archive. Verify against the linked source documents.

Revegetation Research Projects 2008, EKATI Diamond Mine (BHP Billiton, May 2009)

EKATI Diamond Mine Revegetation Research Projects 2008 report (May 2009, BHP Billiton Diamonds Inc., Yellowknife). Documents revegetation trial substrate-placement treatments (1: 20cm lake sediment, 2: 20cm topsoil, 3: 20cm topsoil over 20cm lake sediment, 4: 20cm glacial till, 5: 0-5cm lake sediment), Layfield LP8 Non-woven Geotextile fabric placement under topsoil at Fox Portal vs direct placement, native legume mix and NGC mix seeding, NPK 16-16-16 fertilizer broadcast at 100 kg/ha, tundra plug transplants, smectite mineralogy (montmorillonite, beidellite, saponite), Sodium Adsorption Ratio for soil/irrigation extracts, and soil pH classification table (Very strongly acid 4.5-5.0 through Very strongly alkaline 9.0+).

Date
2009
Document type
Report
Parties
BHP Billiton Diamonds Inc., BHPB
Locations
Yellowknife, Northwest Territories, Ekati
Parameters
revegetation research, reclamation, substrate placement, lake sediment, topsoil, glacial till, ekati diamond mine
Pages
70

Original document

Loading the document…