Surveillance Network Program (SNP) Monthly Report, Ekati Diamond Mine (Arctic Canadian Diamond Company, August 2023)
Burgundy Diamond Mines' August 2023 Surveillance Network Program monthly report for water licence W2020L2-0004, documenting water quality sampling results, flow measurements, and operational data. The report identifies exceedances of total suspended solids and total copper at station 1616-43 on August 22, 2023, with notification sent to GNWT Lands Inspector.
- Date
- 2023-08-01
- Document type
- report
- Parties
- Burgundy Diamond Mines, Wek'èezhii Land and Water Board, GNWT Lands Inspector, Bureau Veritas, Arctic Canadian Diamond Company Ltd
- Locations
- Ekati, Grizzly Lake, Little Lake, Falcon Lake, Thinner Lake, Lac de Gras, Leslie Lake, Cujo Lake, Horseshoe Lake, King Pond, Lac du Sauvage, Polar Lake, Pigeon Pit, Sable Pit, Beartooth Pit, Misery Pit, Lynx Pit, Panda Pit, Koala Pit, Fox Pit, Kodiak Lake, Nero Lake, Nema Lake, Moose Lake, Two Rock Lake, Long Lake Containment Facility, Two Rock Sedimentation Pond, Yellowknife, Northwest Territories
- Parameters
- water quality, total suspended solids, total copper, pH, specific conductivity, water temperature, ammonia, chloride, nitrate, phosphate, sulphate, aluminum, arsenic, cadmium, chromium, iron, uranium, water volume, minewater, sewage effluent, ore production, waste rock, evaporation, precipitation, lake level elevation, recycled water, effluent quality criteria
- Pages
- 207
Original document
Loading the document…