Surveillance Network Program (SNP) Monthly Report, Ekati Diamond Mine (Arctic Canadian Diamond Company, June 2023)
Burgundy Diamond Mines' Surveillance Network Program (SNP) monthly report for June 2023 under Water Licence W2020L2-0004, submitted to the Wek'èezhii Land and Water Board. The report documents water quality monitoring, flow measurements, discharge volumes, and analytical results from 22 samples collected at various monitoring stations around the Ekati Diamond Mine, including an incident of elevated turbidity in King Pond that resulted in temporary suspension of discharge to Cujo Lake.
- Date
- 2023-06-01
- Document type
- report
- Parties
- Burgundy Diamond Mines Limited, Wek'èezhii Land and Water Board, Bureau Veritas, Arctic Canadian Diamond Company Ltd
- Locations
- Ekati Diamond Mine, King Pond, Cujo Lake, Settling Facility, Grizzly Lake, Little Lake, Falcon Lake, Thinner Lake, Lac de Gras, Leslie Lake, Horseshoe Lake, Nema Lake, Moose Lake, Fox Pit, Nero Lake, Kodiak Lake, Lynx Pit, Misery Pit, Pigeon Pit, Sable Pit, Beartooth Pit, Koala Pit, Panda Pit, Two Rock Lake, Lac du Sauvage, Polar Lake, Long Lake Containment Facility, Yellowknife, Northwest Territories
- Parameters
- water quality, hardness, total suspended solids, turbidity, pH, conductivity, effluent quality criteria, ammonia, chloride, nitrate, phosphate, sulphate, metals, aluminum, arsenic, cadmium, chromium, copper, iron, uranium, water discharge, minewater, sewage effluent, ore production, waste rock, evaporation, precipitation, lake level elevation, recycled water
- Pages
- 149
Original document
Loading the document…