Surveillance Network Program (SNP) Monthly Report, Ekati Diamond Mine (Arctic Canadian Diamond Company, September 2023)
Burgundy Diamond Mines' September 2023 Surveillance Network Program monthly report for Water Licence W2020L2-0004 documents water quality monitoring, discharge volumes, and non-compliance issues including exceedance of King Pond discharge limits and Falcon Lake withdrawal restrictions. The report includes detailed field parameters, analytical results, and bioassay data from 20 water samples collected across multiple monitoring stations at the Ekati Diamond Mine.
- Date
- 2023-09-01
- Document type
- report
- Parties
- Burgundy Diamond Mines Limited, Arctic Canadian Diamonds, Wek'èezhii Land and Water Board, Bureau Veritas
- Locations
- Ekati Diamond Mine, King Pond Settling Facility, Cujo Lake, Falcon Lake, Grizzly Lake, Little Lake, Thinner Lake, Lac de Gras, Leslie Lake, Horseshoe Lake, South Fox Lake, Pigeon Pit, Sable Pit, Beartooth Pit, Misery Pit, Panda Pit, Koala Pit, Lynx Pit, Nema Lake, Moose Lake, Fox Pit, Nero Lake, Kodiak Lake, Two Rock Lake, Lac du Sauvage, Point Lake, Long Lake Containment Facility, Yellowknife
- Parameters
- water discharge volume, water withdrawal, King Pond Settling Facility discharge, Falcon Lake withdrawal, lake level elevation, recycled water, minewater pumping, sewage effluent, ore production, waste rock disposal, pH, conductivity, dissolved oxygen, water temperature, ammonia, nitrate, phosphate, sulphate, metals, bioassay, total suspended solids, turbidity, hardness, chloride, evaporation, precipitation
- Pages
- 271
Original document
Loading the document…