Skip to content
AI-generated answers are sourced from this archive. Verify against the linked source documents.

Tailings Management File, Binder 1, Ekati Diamond Mine (Multiple parties, 2002)

Tailings Management Binder 1 (2002) for the Ekati Diamond Mine (BHP Billiton). Correspondence between Ian Goodwin (BHPB), John Witteman (BHP), Derek Chubb (BHPB), Darnell McCurdy (DIAND), Bill Ross (IEMA / Agency), Melody McLeod (MVLWB). Includes the Agency letter on Misery Land Treatment — water-retention times before reaching Cujo Lake, meteorology / precipitation variability impacts, road-side ponding control, contingency plans for treatment-process failure, and ecological effects on valued ecosystem relationships. References Price (1996) Mine Rock and Resource Characterization Guidelines and Mills & Jambor 1995 AQUAMIN (Assessment of the Aquatic Effects of Mining in Canada Working Group) report.

Date
2002
Document type
Report
Parties
BHP Billiton, BHPB, Ian Goodwin, John Witteman, Derek Chubb, Darnell McCurdy, DIAND, Bill Ross, IEMA, Melody McLeod, MVLWB, Latisha Heilman, Allison Armstrong, Anne Wilson, Environment Canada
Locations
Yellowknife, Northwest Territories, Ekati
Parameters
tailings management, misery land treatment, processed kimberlite field characterization, annual water licence geotechnical inspection, class A water licence, ekati
Pages
908

Original document

Loading the document…