Technical Specifications and Construction Drawings, Sable Road Stream Crossings, Ekati Diamond Mine (EBA Engineering, October 2002)

Technical specifications and construction drawings for the installation of three stream crossings (SR-3, SR-4, SR-5) along Sable Road at Ekati Diamond Mine, including detailed requirements for culvert placement, foundation preparation, fill materials, and seepage collar installation.

Date
Document type
Report
Parties
EBA Engineering Consultants Ltd., BHP Billiton Diamonds Inc., Atlantic Industries Limited, Sub-Arctic Surveys Ltd.
Locations
Ekati Diamond Mine, Northwest Territories, Sable Road, SR-3, SR-4, SR-5, Yellowknife, Sable Pit, Pigeon Pit, North Koala Pit, Koala Pit, Beartooth Pit, Panda Pit
Parameters
stream crossings, culvert installation, water quality, foundation preparation, fill placement, seepage collar installation, corrugated galvanized steel pipe, backfill materials, compaction, grain size distribution, invert elevation, road construction
Pages
22

Original document

Loading the document…