Technical Specifications and Construction Drawings, Sable Road Stream Crossings, Ekati Diamond Mine (EBA Engineering, October 2002)
Technical specifications and construction drawings for the installation of three stream crossings (SR-3, SR-4, SR-5) along Sable Road at Ekati Diamond Mine, including detailed requirements for culvert placement, foundation preparation, fill materials, and seepage collar installation.
- Date
- 2002-10-01
- Document type
- report
- Parties
- EBA Engineering Consultants Ltd., BHP Billiton Diamonds Inc., Atlantic Industries Limited, Sub-Arctic Surveys Ltd.
- Locations
- Ekati Diamond Mine, Northwest Territories, Sable Road, SR-3, SR-4, SR-5, Yellowknife, Sable Pit, Pigeon Pit, North Koala Pit, Koala Pit, Beartooth Pit, Panda Pit
- Parameters
- stream crossings, culvert installation, water quality, foundation preparation, fill placement, seepage collar installation, corrugated galvanized steel pipe, backfill materials, compaction, grain size distribution, invert elevation, road construction
- Pages
- 22
Original document
Loading the document…