Transportation Spill Contingency Plan, NWT Diamonds Project (BHP Billiton, January 1997)
BHP Diamonds Inc.'s Transportation Spill Contingency Plan for the NWT Diamond Project outlines emergency procedures, response protocols, and cleanup strategies for hazardous material spills occurring along the 600+ km transportation corridor from the Alberta/NWT border to the Lac de Gras project site, covering petroleum products, chemicals, and compressed gases with specified response actions for different environmental conditions.
- Date
- 1997-01-01
- Document type
- report
- Parties
- BHP Diamonds Inc., NWT Water Board, Department of Indian and Northern Affairs (DIAND), Government of Northwest Territories (GNWT), Environment Canada, Department of Fisheries and Oceans (DFO), Echo Bay Mines Ltd., H.A. Simons, Robinson Enterprises Ltd., Nuna Logistics Ltd., Braden Burry Expediting, Byers Transportation, NWT Transport, Grimshaw Trucking
- Locations
- Northwest Territories, Ekati Diamond Mine (Lac de Gras), Lac de Gras, Yellowknife, Fort Providence, Enterprise, Rae, Tibbitt Lake, Lockhart Camp, Yellowknife River, Ingraham Trail, Winter road corridor, Alberta/NWT border, Lupin Mine, Mackenzie Bison Sanctuary, Wood Buffalo National Park
- Parameters
- spill response, hazardous materials transportation, diesel fuel, gasoline, aviation fuel (JP-4), hydraulic oil, lube oil, waste oil, propane, acetylene, acetic acid, ethylene glycol, ammonium nitrate, sodium nitrite, sodium thiocyanate, N36 emulsifier, Percol 757TC, emergency response, environmental protection, contamination prevention, weather conditions, water quality
- Pages
- 127
Original document
Loading the document…