Waste Rock and Ore Storage Management Plan (WROMP), Version 13.1, Ekati Diamond Mine (Arctic Canadian Diamond Company, May 2025)
Burgundy Diamond Mines submits Version 13.1 of the Waste Rock and Ore Storage Management Plan (WROMP) for the Ekati Diamond Mine to the Wek'èezhìi Land and Water Board, incorporating 16 revisions required by the Board's Decision #2 and addressing regulatory requirements under Water Licence W2022L2-0001. The plan describes waste rock storage areas, geochemical characterization, seepage management, monitoring protocols, and adaptive management strategies for multiple kimberlite pipe developments.
- Date
- 2025-05-29
- Document type
- regulatory-filing
- Parties
- Burgundy Diamond Mines Limited, Wek'èezhìi Land and Water Board, Mason Mantla, Feyi Adebayo, Tania Robitaille, GNWT-ECC, WLWB
- Locations
- Ekati Diamond Mine, Northwest Territories, Yellowknife, Lac de Gras, Panda Pit, Koala Pit, Beartooth Pit, Fox Pit, Misery Pit, Pigeon Pit, Lynx Pit, Sable Pit, Point Lake, Exeter Lake, Ursula Lake, Lac du Sauvage
- Parameters
- waste rock storage, ore storage management, acid rock drainage, metal leaching, geochemical characterization, seepage monitoring, seepage sampling, water quality, permafrost, waste rock pile design, cover design, infiltration rates, ground temperature monitoring, acid-base accounting, neutralization potential, coarse kimberlite rejects, overburden stockpile, adaptive management, closure water quality criteria
- Pages
- 473