Skip to content
AI-generated answers are sourced from this archive. Verify against the linked source documents.

Waste Rock and Ore Storage Management Plan (WROMP), Version 13.0, Ekati Diamond Mine (Arctic Canadian Diamond Company, September 2024)

Burgundy Diamond Mines submits Version 13.0 of the Waste Rock and Ore Storage Management Plan (WROMP) for the Ekati Diamond Mine to the Wek'èezhìi Land and Water Board for approval under Water Licence W2022L2-0001, incorporating revisions from prior board decisions and addressing seepage management, geochemical characterization, and monitoring protocols for multiple waste rock storage areas.

Date
Document type
Regulatory Filing
Parties
Burgundy Diamond Mines Limited, Wek'èezhìi Land and Water Board, Mason Mantla, William Liu, Feyi Adebayo, Tania Robitaille, Landon Murphy, GNWT-ECC, IEMA
Locations
Ekati Diamond Mine, Northwest Territories, Yellowknife, Lac de Gras, Panda Pit, Koala Pit, Koala North Pit, Beartooth Pit, Fox Pit, Misery Pit, Pigeon Pit, Lynx Pit, Sable Pit, Point Lake, Exeter Lake, Ursula Lake, Lac du Sauvage, Long Lake Containment Facility, Two Rock Sedimentation Pond
Parameters
waste rock storage, ore storage management, seepage monitoring, acid rock drainage, geochemical characterization, water quality, permafrost, acid-base accounting, metal leaching, potentially acid generating rock, non-PAG material, kimberlite processing, overburden stockpile, ground temperature monitoring, adaptive management, receiving environment, receiving water, seepage response framework
Pages
472

Original document

Loading the document…