Waste Rock and Ore Storage Management Plan (WROMP), Version 13.0, Ekati Diamond Mine (Arctic Canadian Diamond Company, September 2024)
Burgundy Diamond Mines submits Version 13.0 of the Waste Rock and Ore Storage Management Plan (WROMP) for the Ekati Diamond Mine to the Wek'èezhìi Land and Water Board for approval under Water Licence W2022L2-0001, incorporating revisions from prior board decisions and addressing seepage management, geochemical characterization, and monitoring protocols for multiple waste rock storage areas.
- Date
- 2024-09-26
- Document type
- regulatory-filing
- Parties
- Burgundy Diamond Mines Limited, Wek'èezhìi Land and Water Board, Mason Mantla, William Liu, Feyi Adebayo, Tania Robitaille, Landon Murphy, GNWT-ECC, IEMA
- Locations
- Ekati Diamond Mine, Northwest Territories, Yellowknife, Lac de Gras, Panda Pit, Koala Pit, Koala North Pit, Beartooth Pit, Fox Pit, Misery Pit, Pigeon Pit, Lynx Pit, Sable Pit, Point Lake, Exeter Lake, Ursula Lake, Lac du Sauvage, Long Lake Containment Facility, Two Rock Sedimentation Pond
- Parameters
- waste rock storage, ore storage management, seepage monitoring, acid rock drainage, geochemical characterization, water quality, permafrost, acid-base accounting, metal leaching, potentially acid generating rock, non-PAG material, kimberlite processing, overburden stockpile, ground temperature monitoring, adaptive management, receiving environment, receiving water, seepage response framework
- Pages
- 472
Original document
Loading the document…