Waste Rock and Ore Storage Management Plan (WROMP), Version 8.0, Lynx Diabase, Ekati Diamond Mine (Dominion Diamond, January 2018)
Dominion Diamond Ekati ULC submits updated Waste Rock and Ore Management Plan (WROMP) Version 8.0 and Jay Road Construction Plan Version 2.0 to the Wek'èezhìi Land and Water Board for approval, reflecting the discovery and management of diabase material in the Lynx Pit and its use as non-PAG construction material for roads and infrastructure.
- Date
- 2018-01-25
- Document type
- regulatory-filing
- Parties
- Dominion Diamond Ekati ULC, Wek'èezhìi Land and Water Board, Golder Associates Ltd., Tetra Tech Canada
- Locations
- Ekati Diamond Mine, Northwest Territories, Yellowknife, Lynx Pit, Jay Road, Panda Pit, Koala Pit, Beartooth Pit, Fox Pit, Misery Pit, Pigeon Pit, Sable Pit, Lac de Gras, Long Lake Containment Facility
- Parameters
- waste rock management, ore storage, diabase material, acid-base accounting, acid rock drainage (ARD), metal leaching, potentially acid generating (PAG), non-PAG materials, geochemical characterization, waste rock storage areas (WRSA), construction materials, permafrost aggradation, seepage monitoring, ground temperature monitoring, kimberlite processing, closure and reclamation
- Pages
- 208