Waste Rock Dam and Seepage Collection Dam As-Built Construction Report, Misery Site, Ekati Diamond Mine (EBA Engineering, July 2002)
This as-built construction report documents the monitoring and completion of the Waste Rock Dam and Seepage Collection Dam at the Ekati Diamond Mine's Misery site from November 2001 to May 2002, detailing foundation preparation, material placement, liner system installation, thermosyphon construction, and quality assurance testing.
- Date
- 2002-07-01
- Document type
- report
- Parties
- BHP Billiton Diamonds Inc., EBA Engineering Consultants Ltd., Nuna Logistics Ltd., Sub-Arctic Surveys Ltd., Layfield Environmental Systems Ltd., Arctic Foundations of Canada Inc., NWT Rock Services Ltd., Eagle Mapping Services Ltd.
- Locations
- Ekati Diamond Mine, Misery Pit, Misery Site, King Pond, Northwest Territories, Edmonton, Alberta, Yellowknife
- Parameters
- waste rock dam construction, seepage collection dam, composite liner system, polypropylene geomembrane, geosynthetic clay liner, permafrost, horizontal thermosyphons, ground temperature, water quality, water retention, foundation preparation, material compaction, percolation testing, settlement monitoring
- Pages
- 549