Skip to content
AI-generated answers are sourced from this archive. Verify against the linked source documents.

Waste Rock Management Plans, Fox & Misery Pipes, Ekati Diamond Mine (BHP Billiton, 1998 to 2003)

Waste Rock Management Plans binder for the Ekati Diamond Mine (BHP Billiton Diamonds Inc.) covering 2000–2006. Includes Kevin Morin (Day, 2003) analysis of acid rock drainage (ARD) prediction problems at Ekati, Sexsmith / Milnes ARD reviews, Agency (Independent Environmental Monitoring Agency) reviews of Waste Rock and Ore Storage Management plans (Red Pederson, Melody McLeod, Gordon Wray correspondence), MVLWB correspondence on Operating Environmental Management Plan support documents, BHP Billiton diamond drill logs (FGT-07 — biotite granite, plagioclase, K-alteration), EBA Engineering Consultants 1997 tailings size-distribution data (Gaudin-Schuhmann), and proposed Misery, Panda/Koala, North/South/East waste rock dump configurations on Lac de Gras.

Date
1998–2003
Document type
Report
Parties
BHP Billiton Diamonds Inc., BHP, Kevin Morin, Day, Sexsmith, Milnes, Independent Environmental Monitoring Agency, Melody McLeod, MVLWB, Red Pedersen, Scott Williams, Gordon Wray, NWT Water Board
Locations
Yellowknife, Northwest Territories
Parameters
waste rock management plans, acid rock drainage, ARD prediction, kimberlite, mineral water interactions, storage management plan, ekati diamond mine
Pages
250

Original document

Loading the document…