Skip to content
AI-generated answers are sourced from this archive. Verify against the linked source documents.

Waste Rock & Ore Storage Management Plan and Wastewater & Processed Kimberlite Management Plan, Ekati Diamond Mine (BHP Billiton, February 2000)

This document is the Waste Rock and Ore Storage Management Plan for the Ekati Diamond Mine, detailing the characterization, geochemical testing, and management strategies for mine waste rock, ore storage, and drainage from four kimberlite pipes (Panda, Koala, Misery, and Fox) scheduled for sequential mining between 1997 and 2014. The plan includes rock type geology, results of geochemical testing, water quality predictions, waste management strategies, and monitoring protocols required under the Type A Water Licence.

Date
Document type
Report
Parties
BHP, Ekati Diamond Mine, Department of Indian Affairs and Northern Development (DIAND)
Locations
Ekati Diamond Mine, Yellowknife, Northwest Territories, Panda pipe, Koala pipe, Koala North, Misery pipe, Fox pipe, Leslie pipe, Sable pipe, Pigeon pipe, Beartooth pipe, Lac de Gras, Lac du Sauvage, Long Lake, Koala Watershed, Panda Lake, Koala Lake, Misery Lake, Fox Lake, Slave Structural Province
Parameters
waste rock, ore storage, acid rock drainage (ARD), alkaline drainage, metal leaching, geochemical characterization, rock type classification, kimberlite, granite, schist, diabase, water quality prediction, leachate chemistry, processed kimberlite, tailings, seepage monitoring, pH, sulphate, static geochemistry, kinetic geochemistry, humidity cell testing
Pages
223

Original document

Loading the document…