Skip to content
AI-generated answers are sourced from this archive. Verify against the linked source documents.

Wastewater and Processed Kimberlite Management Plan, Ekati Diamond Mine (BHP Billiton, May 2003)

This is an integrated Wastewater and Processed Kimberlite Management Plan for the Ekati Diamond Mine covering two water licences, detailing the management of wastewater sources (lake dewatering, pit water, sewage, site drainage) and processed kimberlite disposal at the Long Lake Containment Facility and other settling ponds over the mine's operational life through 2014.

Date
Document type
Report
Parties
BHP Billiton Diamonds Inc., Northwest Territories Water Board, Mackenzie Valley Land and Water Board, EBA Engineering Consultants Ltd., Klohn Crippen Consultants Ltd.
Locations
Ekati Diamond Mine, Northwest Territories, Long Lake Containment Facility, Panda Pit, Koala Pit, Misery Pit, Fox Pit, Sable Pit, Pigeon Pit, Beartooth Pit, King Pond, Two Rock Lake, Cell B, Cell C, Cell D, Cell E, Kodiak Lake, Fox Lake, Sable Lake, Beartooth Lake, Pigeon Pond, Ursula Lake, Upper Exeter Lake, Horseshoe Lake, Little Reynolds Stream, Koala Watershed
Parameters
wastewater management, processed kimberlite, water quality, water discharge, suspended solids, turbidity, water balance, solids content, void ratio, moisture content, pH, particle size distribution, flocculation, coagulation, dewatering, sewage treatment, pit water management, lake dewatering, water conservation, consolidation, frost heave, geotechnical properties
Pages
107

Original document

Loading the document…