Wastewater and Processed Kimberlite Management Plan Version 2.0, EKATI Diamond Mine (BHP Billiton, October 2011)
BHP Billiton's Wastewater and Processed Kimberlite Management Plan Version 2.0 (October 2011) describes the comprehensive management strategy for all wastewater and fine processed kimberlite at the Ekati Diamond Mine, submitted to the Wek'èezhii Land and Water Board for approval under Water Licence W2009L2-0001. The plan proposes significant updates to processed kimberlite deposition strategy, deferring or potentially eliminating the need for Cell D deposition by utilizing upstream areas in Cells A and C and the mined-out Beartooth Pit, while maintaining water quality standards and minimizing environmental effects in the receiving environment.
- Date
- 2011-10-20
- Document type
- report
- Parties
- BHP Billiton Canada Inc., Wek'èezhii Land and Water Board, Robertson GeoConsultants Inc., Environment Canada, Government of Northwest Territories, Aboriginal Affairs and Northern Development Canada, Independent Environmental Monitoring Agency
- Locations
- Ekati Diamond Mine, Northwest Territories, Yellowknife, Long Lake Containment Facility, Beartooth Pit, Panda Lake, Kodiak Lake, Upper Panda Lake, Koala Pit, Fox Pit, Misery Pit, Pigeon Lake, Sable Lake, Two Rock Lake, Bearclaw Lake, Upper Exeter Lake, Ursula Lake, Leslie Lake, Cujo Lake, Lac de Gras, Koala Watershed, Pigeon Watershed, Sable Watershed
- Parameters
- wastewater management, processed kimberlite deposition, fine processed kimberlite, water quality, minewater, sewage, total suspended solids, ammonia, nitrate, chloride, water discharge criteria, closure planning, pit lake formation, water recycling, flocculants, acid rock drainage, total dissolved solids, metal leaching, geotechnical stability, ice entrainment, extra fine processed kimberlite, freeboard management, water balance, discharge spigots
- Pages
- 140