Wastewater & Processed Kimberlite Management Plan, Appendix 8.2-1, Ekati Diamond Mine (BHP Billiton, January 2002)

This preliminary Wastewater and Processed Kimberlite Management Plan for the Ekati Diamond Mine describes comprehensive waste water management strategies and processed kimberlite disposal methods for the mine's 17-year operational life, including details on lake dewatering, pit water management, the Long Lake Containment Facility, and remote site operations at Misery and Sable.

Date
Document type
Report
Parties
BHP Billiton, Mackenzie Valley Land and Water Board (MVLWB), Ekati Diamond Mine
Locations
Ekati Diamond Mine, Yellowknife, Northwest Territories, Long Lake, Panda Lake, Koala Lake, Fox Lake, Sable Lake, Beartooth Lake, Pigeon Lake, Misery Lake, King Pond, Two Rock Lake, Lac de Gras, Leslie Lake, Kodiak Lake, Horseshoe Lake
Parameters
wastewater management, processed kimberlite, water quality, suspended solids, lake dewatering, pit water, sewage treatment, water discharge, water balance, sedimentation, flocculants, coagulants, turbidity, consolidation, water level, solids elevation, runoff, precipitation, evaporation, groundwater inflow, ammonia, pH, particle size distribution, permafrost, frost heave
Pages
91