Preliminary Design of Water Control Structures for Sable, Pigeon and Beartooth Pit Developments, Ekati Diamond Mine (EBA Engineering, April 2000)
Preliminary design report for water control structures at three proposed kimberlite pit developments (Sable, Pigeon, and Beartooth) at the Ekati Diamond Mine, including specifications for retention dams, filter dykes, stream diversions, and water management systems to address pit dewatering, sediment control, and environmental protection.