Annual Water Licence Geotechnical Inspection (2003), Ekati Diamond Mine (EBA Engineering, July 2003)
EBA Engineering Consultants Ltd. completed the annual water licence geotechnical inspection of seven water control structures at Ekati Diamond Mine between July 6-9, 2003, including Phase I Pond, Panda Diversion Dam, Long Lake Outlet Dam, Intermediate Dyke B, King Pond Dam, Waste Rock Dam, and Desperation Pond Cofferdams, documenting their condition through visual observations, ground temperature data, and settlement monitoring.